| MANUFACTURING
FACILITY 1
Renovation of Process Manufacturing Facility
Design
Build equipment installation
Equipment
height required existing roof height to be increased
In
house design of structural, piping, electrical and HVAC equipment
Schedule
required 6 days a week 10 hours per day for over a 1 year period
Multiple
value engineering design improvements resulting in substantial cost
savings to project
Project
completed with zero lost time injuries
<