Natural by Nature

Electrical Installation of New Process Equipment for the Manufacturing of Milk

M. Davis assisted Natural by Nature with the building of their brand-new facility in Newark, Delaware. We brought the required industry knowledge to the installation of new processes in keeping with FDA and cGMP standards. This project utilized all our trades, including electrical and mechanical teams.

Project Details

  • Installation of new I/O cabinet
  • Food grade/ clean room conduit installation
  • Installation and wiring of new pumps/motors and VFD’s
  • Power wiring up to 480V 3 Phase up to 100A:
    • Tank agitators
    • Separators
    • Homogenizers
    • Chiller pumps and re-circulators
  • Local pin and sleeve disconnects for:
    • Raw product pumps
    • Batch pumps
    • Transfer pumps
  • Installation and wiring of new I/O cabinets
  • Controls wiring including power wiring to all remote instruments and devices
  • I/O wiring to vessel level and temperature transmitters
  • I/O wiring to fluid transfer manifold positioning switches
  • I/O wiring for equipment communication
  • HMI power and communication wiring