West-Ward

Pharmaceutical Compound Facility

HVAC and process piping was being upgraded, but it was necessary to keep the area segregated until it was time to tie into the rest of the facility. By contracting with M. Davis, West-Ward could go to one source for mechanical, electrical and structural steel work.

Scope of Work

Design and installation of turnkey mechanical and electrical systems for a new addition. The new systems had to be installed without shutting everything down, then integrated into existing cGMP areas through carefully coordinated, scheduled shutdowns.

Project Details

M. Davis provided:

  • Design expertise utilizing 3D AutoCAD
  • Installation of fully functional pharmaceutical process piping system
  • Extensive orbital welding of pharmaceutical grade process piping
  • Employees trained to cGMP protocols