INDUSTRY: Pharmaceutical KEY SERVICES UTILIZED: CAD, Shop Fabrication, Rigging, Demolition, Pipe Installation |
|||
<< PREV CASE STUDY
PROJECT NAME OR TYPE:R&D Building, Chilled Water Upgrades Project Phase – 2 PROBLEM OR TASK:To complete “Phase 2” of a seven phase chilled water upgrade project located in the fourth floor mechanical penthouse of a fully functioning research and development facility without interrupting the normal day to day operations of the buildings. OUR SOLUTION OR DESCRIPTION OF WHAT WE DID:MDavis fabricated and installed:
UNIQUE CHARACTERISTICS OF OUR WORK:This project was completed during the winter months (November through March) in an effort to minimize the demands on the chilled water systems. This compressed time frame, combined with the fact that the building was operational during the project, meant that elaborate scheduling and coordination was crucial to the success of the project. |
|||