INDUSTRY: Pharmaceutical KEY SERVICES UTILIZED: Rigging, Orbital Welding, Mechanical Service Piping, CAD Layout, Duct Work, Steel Erection |
|||
![]() ![]() ![]()
|
<< PREV CASE STUDYNEXT CASE STUDY >>
PROJECT NAME OR TYPE:Building 3 Renovation PROBLEM OR TASK:Renovate 8,000 square feet of pharmaceutical space for the client. OUR SOLUTION OR DESCRIPTION OF WHAT WE DID:MDavis fabricated and installed the HVAC and piping systems for the client’s emulsion specialty products manufacturing and fermentation areas. UNIQUE CHARACTERISTICS OF OUR WORK:There were stringent standards for leakage rate on all ductwork. The use of flexible ducts was not permitted and all exhaust ducts were welded stainless steel, tested to a leakage rate of less than 0.25 %. |
||